|
|
|
|
BACnet Thermostat
|
EXL01655 Makeup Air Unit with Paint Booth and Building Pressure Control |
- BACnet Makeup Air Unit with Paint Booth and Building Pressure Controller
- Makeup Air Unit operates from the internal schedule
- Makeup Air Winter Mode (Heating) is enabled by the Outside Air Temperature and the Local Setpoint
- Paint Booth status is interlocked to start the Makeup Air Unit
- General Exhaust Fan is interlocked with the Makeup Air Unit and disabled when the Paint Booth is running
- Building pressure is measured from +/- .5" WC and controls the Makeup Air unit Fan Speed
- Includes:
- ExactLogic controller
- Outside Air Sensor
- Building Pressure Sensor
|
|
|
Your Price: $299.88 |
|
|
|
EXL01680 BACnet Lead Lag Pump |
- Operates Core, Heating, or Cooling Pumps Loops
- Includes 2 EXL0310 Analog Current Sensors
- Includes EXL03015 wet-wet differential sensor
- The pumps can be runtime switched by day, week,
month, or custom hours of runtime.
- Failure of the lead pump starts the lag pump.
|
|
|
Your Price: $508.68 |
|
|
|
EXL01682 BACnet Boiler and Pump |
- Operates Boiler and Lead / Lag Pumps
- Includes 2 EXL03010 Analog Current Sensors
- Boiler Temperature Reset Output 0-10Vdc (or 0-5Vdc)
- The pumps can be runtime switched by day, week,
month, or custom hours of runtime.
- Failure of the lead pump starts the lag pump
|
|
|
Your Price: $255.40 |
|
|
|
EXL01690 BACnet Heating / Cooling 1-4 Stage Control |
- BACnet communications
- Roof Top Unit
- 1-4 stages of Cooling or
- 1-4 stages of Heating
- Control algorithm minimizes cycling
- Dry Cooler
- 1-4 Stage Cooling
- Control algorithm minimizes cycling
|
|
|
Your Price: $158.00 |
|
|
|
EXL01691 BACnet Dry Cooler with 0-10 stages of cooling |
- BACnet communications
- Dry Cooler
- Duct Heater
|
|
|
Your Price: $158.00 |
|
|
|